NORCAR a7750 Power+ WHEELED MINILOADER
The Norcar a7750 Power+ Edition showcases a new lifting boom design featuring robust reinforcements, enhanced construction, and increased lifting capacity. The Norcar a7750 Power+ Edition sets a new standard for mini loaders with its versatility, strength, and performance.
This powerhouse of a machine is ideal for a wide range of applications and industries. It excels in landscaping, construction, agriculture, property maintenance, and more. Whether you need to lift heavy materials, clear debris, or transport equipment, the Norcar a7750 Power+ Edition is the ultimate solution.
Designed to meet the evolving needs of professionals across various sectors, the Norcar a7750 Power+ Edition is engineered to empower operators, increase productivity, and elevate performance in every task.

Updated with Power+
I
Increased lifting power
The machines can now handle heavier loads and more demanding tasks,making them ideal for various applications.
Stronger boom construction
The reinforced boom construction provides increased durability and reliability,allowing the machines to endure more intensive and prolonged use withoutcompromising performance or safety
Expansion of work areas
With the improved specifications in the Power+ Edition, Norcar machines cannow be used in even more work environments and applications. The increasedversatility makes them a valuable tool for both small and large projects, fromconstruction sites to agriculture and green space maintenance.

Foldable Canopy
There are now three different types of rollover protection for the Norcar 6000 or 7000 series machines to choose from - the standard Roll bar ROPS/FOPs, a full Cab, or a foldable canopy.
The new Foldable Canopy is designed to provide increased flexibility in situations where the machine’s height may be a limiting factor. For example, when passing through low doorways or areas with restricted clearance. The structure is robust and maintains safety and stability in the upright position, while the roof can be temporarily folded down to reduce height when needed.
A robust protection frame is mounted at the front, offering additional shielding from obstacles. It also serves as a practical mounting point for two powerful LED work lights and includes ergonomically placed handles to support safe and comfortable entry and exit.
Turning Radius


Tipping Load

| Tipping load | +extra weight 364kg | |||
|---|---|---|---|---|
| Tipping load with pallet fork | Straight | Articulated | Straight | Articulated |
| A. Transport position, kg | 1950 | 1560 | 2100 | 1900 |
| B. Boom horizontal, kg | 2200 | 1500 | 2400* | 2000 |
| C. Boom horizontal, kg | 1500 | 1150 | 2150 | 1480 |
| D. Boom horizontal+ extension, kg | 1250 | 870 | 1660 | 1100 |
| E. Boom horizontal + extension kgal, kg | 1000 | 700 | 1350 | 930 |
Specifications
| Engine | |
|---|---|
| Make | Kubota |
| Model | D 1803-CR-T E5B |
| Cylinders | 3 |
| Fuel type | Diesel |
| Cylinder volume (cm³) | 1826 |
| Power | |
|---|---|
| SAE, gross power (kW/hp) | 37/49,6 |
| Max gross torque (Nm) | 150 |
| At engine speed (r/min) | 1600 |
| Max engine speed without load (r/min) | 2900 |
| Electrical System | |
|---|---|
| Battery (V-Ah) | 12 - 77 |
| Generator (A) | 70 |
| Service Volumes | |
|---|---|
| Cooling System (l) | 7 |
| Engine Oil (l) | 7 |
| Fuel Tank (l) | 27 |
| Hydraulic Tank (l) | 56 |
| Hydraulic System Total Volume | 61 |
| Performance | |
|---|---|
| Lifting Power Hydraulic (kg) | 2500 |
| Breakout force 50cm (kg) | 1800 |
| Tipping load, straight (kg) | 1760 |
| Tipping load, articulated (kg) | 1230 |
| Operating weight (kg) | 2170 |
| Drive speed low (km/h) | 0-14 |
| Drive speed high (km/h) | 0-28 |
| Pulling force high (kg) | 950 |
| Pulling force low (kg) | 1900 |
| Hydraulic System | |
|---|---|
| Working Hydraulics (l/min) | 70 |
| System pressure (bar) | 240 |
| Drivetrain hydraulics (l/min) | 124 |
| Drivetrain max system pressure (bar) | 400 |
| Cycle Times | |
|---|---|
| Raising boom (s) | 3,6 |
| Lowering boom (s) | 2,2 |
| Folding in bucket (s) | 2,5 |
| Tipping bucket (s) | 2,2 |
| Steering wheel rotations (L/R rev) | 4/5 |
Standard equipment
- Roll bar ROPS/FOPS, seatbelt
- Led work lights, front (roof)
- Electrically maneuvered parking brake / automatic safety system
- Float on the lifting boom
- Hand throttle / Foot throttle
- Digital display 4,3” dashboard information
- Suspension seat with armrest
- Adjustable steering column
- Automotive F-N-R drive system with inching pedal.
Optional Extras
Tires
Tools - Very Compatible
Tools - Compatible
Norcar a7750 Comfort Cab

When you equip your Norcar loader with a comfort cabin you can safely perform all tasks during the year and in all weather conditions. You get access to a heated, insulated work environment with excellent visibility in all directions. The cabin has a high equipment level as standard, but there is a couple of extras also available to increase your comfort.
- 70 amp. alternator
- Heated cabin
- Radio and speakers
- Windshield wiper
- LED work lights, two in the front and one in the rear
- Side window that you can open
- Cabin door that you can lock in the open position
- Glass roof (helps loading/unloading)
- Warning beacon
Optional extras for the Comfort Cab include air conditioning, rear view camera and Lightbar LED















































































