NORCAR a6226 Power+ WHEELED MINILOADER

Norcar a6226Wheeled Miniloader for sale from Green Plant

Upgraded to Power+ Edition – Stronger lifting boom and increased lifting power, now handling up to 1100 kg on a pallet.


Norcar a6226 has the same compact design as the a6026, but with higher specifications as standard. Equipped with dual working hydraulic pumps, the machine is well prepared for attachments requiring high oil flow. Moreover, several functions can be used simultaneously without affecting each other, which makes work more efficient.
The machine offers high pulling force, speed and lifting power as standard, and is a machine for professional use.

Norcar Power+ Editions

Updated with Power+

I

Increased lifting power
The machines can now handle heavier loads and more demanding tasks,making them ideal for various applications.


Stronger boom construction
The reinforced boom construction provides increased durability and reliability,allowing the machines to endure more intensive and prolonged use withoutcompromising performance or safety


Expansion of work areas
With the improved specifications in the Power+ Edition, Norcar machines cannow be used in even more work environments and applications. The increasedversatility makes them a valuable tool for both small and large projects, fromconstruction sites to agriculture and green space maintenance.


Norcars - now available with a canopy

Foldable Canopy


There are now three different types of rollover protection for the Norcar 6000 or 7000 series machines to choose from - the standard Roll bar ROPS/FOPs, a full Cab, or a foldable canopy.   


The new Foldable Canopy is designed to provide increased flexibility in situations where the machine’s height may be a limiting factor. For example, when passing through low doorways or areas with restricted clearance. The structure is robust and maintains safety and stability in the upright position, while the roof can be temporarily folded down to reduce height when needed.


A robust protection frame is mounted at the front, offering additional shielding from obstacles. It also serves as a practical mounting point for two powerful LED work lights and includes ergonomically placed handles to support safe and comfortable entry and exit.

Turning Radius

Norcar a6226 Miniloader Turn Radius

Loading Height

Norcar a6226 Load Height

Tipping Load

Norcar a6226 Miniloader Tipping Load
Tipping load +extra weight 180kg
Tipping load with pallet fork Straight Articulated Straight Articulated
A. Transport position, kg 1300 650 1300* 940
B. Boom horizontal, kg 1250 790 1650 1040
C. Boom horizontal, kg 850 500 1100 690
D. Boom horizontal+ extension, kg 690 420 930 520
E. Boom horizontal + extension kgal, kg 550 300 730 460
* Limited by hydraulic

Specifications

Engine
Make Kubota
Model 1105
Cylinders 3
Fuel type Diesel
Cylinder volume (cm­³) 1123
Cooling system Fluid
Power
SAE, gross power (kW/hp) 18,5/24.8
Max gross torque (Nm) 72
At engine speed (r/min) 2200
Max engine speed without load (r/min) 3000
Electrical System
Battery (V-Ah) 12 - 53
Generator (A) 40
Service Volumes
Cooling System (l) 6
Engine Oil (l) 5
Fuel Tank (l) 20
Hydraulic Tank (l) 50
Hydraulic System Total Volume 55
Performance
Lifting Power Hydraulic (kg) 1250
Breakout force 50cm (kg) 960
Tipping load, straight (kg) 1150
Tipping load, articulated (kg) 770
Operating weight (kg) 1320
Drive speed low (km/h) 0-9
Drive speed high (km/h) 0-19
Pulling force high (kg) 550
Pulling force low (kg) 1100
Hydraulic System
Working Hydraulics (l/min) (18+24) 42
System pressure (bar) 240
Drivetrain hydraulics (l/min) 63
Drivetrain max system pressure (bar) 350
Cycle Times
Raising boom (s) 3.7
Lowering boom (s) 2.2
Folding in bucket (s) 2.6
Tipping bucket (s) 1.6
Steering wheel rotations (L/R rev) 3/4

Norcar Drive Systems

EasyDrive
EasyDrive

With the hand throttle, the engine’s RPM can be adjusted to suit the given application and to the needs of any hydraulic equipment.


Operation is soft and seamless when using the two separate pedals for driving forward or backward. The pedals are operated with the right foot, and they offer a relaxing and ergonomic driving position.



The EasyDrive system is well-suited to situations in which there are a great number of users, e.g., for rentals, in stables and for private users. Operators quickly get used to handllng the loader in a safe and efficient manner with the EasyDrive system.

ProDrive
ProDrive

The engine’s RPM is governed by a gas pedal operated with your right foot. With the ProDrive system, the engine’s RPM can also be adjusted by means of a hand throttle, allowing for an efficient use of hydraulic equipment, such as lawn mowers.


The direction of travel and speed are adjusted softly and seamlessly with the left foot pedal without you needing to move your foot. The machine is operated simply by pressing the pedal forward or backard for driving, while the loader remains stationary when the pedal is in the middle position.


One great advantage of the ProDrive system is the ability to use the foot throttle in order quickly to adjust the engine’s RPM for faster lifting and for more power, or else for calm and silent driving when the power is not needed. The ProDrive system is well-suited for work requiring a high degree of precision, e.g., working on green areas, stone paving and demolition work.


Automotive
Automotive

The direction of travel is selected by a button on the loader’s control stick.

With the Automotive drive system, the engine’s RPM can also be adjusted by a hand gas throttle, allowing for an efficient use of hydraulic equipment, such as lawn mowers.


The loader’s driving speed and the engine’s RPM are regulated by a gas pedal operated with the right foot.


At your left foot, there is a combined brake and clutch that allows you manually to reduce the driving speed, even at a high RPM, e.g., during loading work or when using equipment requiring a high engine RPM.



The drive system is easy to run and is excellent for loading, as well as for more continuous driving along roads and streets. Operating the system can be likened to driving a car with an automatic transmission.


Standard equipment

  • Roll bar ROPS/FOPS, seatbelt
  • Working lights, front
  • Electrically maneuvered parking brake/safety system
  • Float on the lifting boom
  • Hand throttle/Foot throttle
  • Engine speed and hour meter, engine heat and fuel level gauges
  • Suspension seat with armrests
  • Adjustable steering column
  • ProDrive
MultiFaster Quick release coupling
Traction control
Extension Boom
Parallel leveller
Hydraulic Outlet, rear
Hydraulic Oil Cooler
ProDrive
Two Speed Ranges
High Capacity Hydraulics
FOPS Protective Roof

Optional Extras

Traffic Equipment
Comfort Seat
Comfort seat, electrically heated
Seat Heater
Hitch Combo
Engine Pre-heater
Beacon Lights
Hitch
Hydraulic Quick Lock
LED Work Lighting
Rear Working Lights
Rear view mirrors
Alternator 60A
Vehicle Motion Alarm
Bottom Armour
EasyDrive
Automotive
Mounting Plate for Counter Weight and Hitch Bracket
Extra Hydraulic Outlet, front
Oscillation lock
Full traction control
Hydraulic Outlet, rear
Windshield
Counterweight System
Euro/Trima/SMS
Load Warning System
Catalytic Converter

Tires

Tire 23 x 10,5 - 12 TR
Tire 23 x 10,5 - 12 GR
Tire 23 x 12,5 - 12 GR
Tire 23 x 8,5 - 12 GR
Tire 23 x 8,5 - 12 IN
Tire 23 x 8,5 - 12 IN

Tools - Very Compatible

Universal bucket (125 cm)
Light material bucket (120cm)
Heavy duty bucket (90 cm)
Heavy duty bucket (105 cm)
Heavy duty bucket (120 cm)
Levelling bucket (120 cm)
Leveller
Leveller HD (120 cm)
Leveller HD (150 cm)
Grapple bucket
Rock grapple
Pallet fork (100 cm)
Pallet fork - hydraulic
Ground Auger
Dosing feeder
Large sack lift
Trailer - 3 way tip
Matrix, asphalt surfacing equipment
Jib Boom
Stone Grab
Snow blade (140 cm)
Snow blade 25 + 25
Sand spreader
High Pressure washer
Grapple with Rotator
Push Broom 150 cm
Push Broom 200 cm
Brush, round (plastic)
Brush, round (plastic + steel)
Brush without collector
Brush Unit 1500
Brush unit 1500, open
Snowblower 1200 G
Trencher
Lawn mower (120 cm)
Lawn Mower (150cm)
Lawn Mower (180cm) HD
Bale Spear
Round bale spear
Round bale grab
Fence Mower
Silage fork (90 cm)
Silage fork (105 cm)
Feeding Passage Scraper
Manure Fork (112cm)
Manure Fork 155cm
Waste Manure Collector
Digging equipment mini
Horse Arena Grader / Leveller (150)
Horse Arena Grader/Leveller (180)
Flail shredder (130 cm)
Cultivator
Rubber scraper (150cm)
Grapple Bucket (100cm)

Tools - Compatible

Light material bucket (105 cm)
Light material bucket (150 cm)
Heavy duty bucket (140 cm)
Levelling bucket (150 cm)
Universal Bucket (108cm)
Wing Bucket
Snow blade (190 cm)
Brush Unit 1500
Brush Unit 1800,
Brush unit 1800, open
Silage fork (90 cm)
Flail shredder (153 cm)
Silage Fork HD (130cm)
Grapple bucket (130 cm)
Rubber Scraper (180cm)

a6226 BROCHURE

Norcar a6226 brochure

NORCAR a6226 VIDEOS

Related Machines